Rough cut of “Woman with Knife #5″ complete!
After sitting on the tapes for a year, I finally edited the film…in three days! I was waiting to calibrate my speakers before finalizing TFII and archiving it to make space for WWK. Once I had purchased a sound level meter, I was able to listen to TFII confident that my speakers were properly set up. I will write about the calibration procedure separately.
Now I need to have the actresses do a dubbing session before I can proceed with post-production.

Activity: Last 10 Weeks
on June 26th, 2007 at 14:45 Quote
Now this I’ve been waiting to hear! Let’s hope OTW is on schedule.
on June 28th, 2007 at 23:23 Quote
It is; you can see the post-production schedule here (to be removed once the project is complete). I also posted a little teaser for WWK. That’s what happens when you have don’t have an A.D. to slate you.
on July 12th, 2007 at 15:59 Quote
I got in touch with the local SAG office about dubbing Alecia. I hope I do not have to go through a ream of paperwork before we can simply record her voice
Mark provided some useful feedback about the editing. I will try to accommodate it.
on July 15th, 2007 at 23:28 Quote
SAG gave us the OK! Apparently you do not need permission to dub shorts over a year after the production. Such arcane laws!
In the meantime, Mark and I fine-tuned the pacing. As usual, he pushed for slower.
Last but not least, our composer is on the case.
Next I will rotoscope some props out.